Terminal development of a low-cost terminal and pier alongside the planned Terminal 3 at Frankfurt Airport.
FRANKFURT AIRPORT | TERMINAL 3 – Pier G
The project includes capacity analysis, development of programme of requirements, functional terminal planning and stakeholder coordination. The key task of this project is to meet the demand of a growing low-cost traffic at Frankfurt Airport, whilst integrating it into an ongoing Terminal 3 project on neighbouring site.
Services
- Development of Programme of Requirements
- Development of terminal layout options and assessment against design criteria
- Planning of phased terminal development
- Detailed development of preferred terminal layout
- Coordination of stakeholders including terminal ops, retail, baggage handling, etc.
Facts & Figures
Client | Fraport AG |
Location | Frankfurt, Germany |
Date | since 2016 |
Size | approx. 75.000 m² |
Concept photos, 2016
![](https://i2.wp.com/wip.iadc-studio.de/wp-content/uploads/2021/10/csm_CHM_Pier_G_T3_-_2019_Luftbild_Frankfurt__2_gross_9942754c19-1024x512.jpg)
![](https://i0.wp.com/wip.iadc-studio.de/wp-content/uploads/2021/10/csm_fraport_Headerbild_7cfe3a867e-1024x629.jpg)
![](https://i0.wp.com/wip.iadc-studio.de/wp-content/uploads/2021/10/csm_CHM_PierG_201903_Check-in_Halle_c5f5adebb7-1024x512.jpg)
![](https://i1.wp.com/wip.iadc-studio.de/wp-content/uploads/2021/10/check-in_pierG_01-1024x512.jpg)
![](https://i2.wp.com/wip.iadc-studio.de/wp-content/uploads/2021/10/PIER_G_04_tag_bodendunkel-1024x768.jpg)
Building Site photos Pier G 2022, Frankfurt Airport
![](https://i1.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/Luftaufnahme-2022_05-11-1024x683.jpeg?ssl=1)
![](https://i1.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/95c63674-063f-4574-aa7e-978758e304bc_w948_r1.778_fpx30_fpy45.jpg?ssl=1)
![](https://i0.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/28035965-foto-einer-halle-mit-einer-hohen-decke-leeren-stuehlen-und-steinsaeulen-2vbXQ5TSXJec-1024x1024.jpg?ssl=1)
![](https://i1.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/p_13869-1024x682.jpg?ssl=1)
![](https://i0.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/Pier-G_2021_08-1-1024x683.jpeg?ssl=1)
![](https://i2.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/Pier-G_2022_04_Luftaufnahme-1024x683.jpeg?ssl=1)
![](https://i1.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/Pier-G_2022_04_Grenzkontrollschalter-1-1024x683.jpeg?ssl=1)
![](https://i2.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/Pier-G_2022_04_Gepackforderanlage-2-1024x683.jpeg?ssl=1)
![](https://i1.wp.com/www.iadc-studio.de/wp-content/uploads/2023/03/Luftaufnahme-2022_05-46-1024x683.jpeg?ssl=1)